|
|
|
|
|
|
|
|
|
|
|
|
|
2083
|
|
|
|
HARRY HUGHES, Governor
|
|
|
|
|
|
|
|
|
|
|
(3) "LATERAL SYSTEM CONSTRUCTION COSTS" INCLUDE:
(I) ANY EXPENSES NECESSARY TO PLAN, DESIGN,
ACQUIRE, CONSTRUCT, INSPECT, TEST, AND PLACE INTO OPERATION THE
LATERAL SYSTEM SERVING THE STATE BUILDING OR FACILITY; AND
(II) ANY INDIRECT EXPENSE NECESSARY TO
CONSTRUCT WATER AND SEWER LINES THAT THE LOCAL JURISDICTION
INCURS.
[(a)] (B) (1) The State shall pay ITS SHARE OF the annual
operating costs of furnishing water and sewer service to State
buildings and facilities and its share of those lateral system
construction costs associated with future installation of water
and sewer lines that directly serve the State building or
facility.
(2) THE STATE SHALL ALSO PAY THE COST OF EXPANDING A
WATER OR SEWAGE TREATMENT FACILITY WHICH IS NECESSITATED BY THE
STATE'S UTILIZATION OF THAT FACILITY, BUT IN AN AMOUNT NOT TO
EXCEED THE COST OF THE ACTUAL CAPACITY USED BY THE STATE.
[(b) The Secretary of the Department of General Services
shall make rules and regulations governing payments by the State
or any of its agencies or instrumentalities to any county,
municipality, or special district of water and sewer user charges
and of future lateral, system construction costs for extending
water and sewer systems to provide service for State buildings or
facilities.]
(C) THE STATE SHALL PAY ALL CHARGES, FEES, AND ASSESSMENTS:
(1) LEVIED BY THE LOCALITY IN WHICH THE STATE
BUILDING OR FACILITY IS LOCATED; AND
(2) DESIGNATED TO PAY FOR ANNUAL OPERATING COSTS AND
LATERAL SYSTEM CONSTRUCTION COSTS.
(D) (1) REGARDLESS OF THE LOCATION OF THE STATE FACILITY
AND UPON THE STATE AGREEING TO PAY THE COSTS SET OUT IN
SUBSECTION (B) OF THIS SECTION, AND ANY ADDITIONAL COSTS OF
CONSTRUCTION ASSOCIATED WITH THE CONNECTION OF A STATE FACILITY
TO A PUBLIC UTILITY SYSTEM, THE STATE MAY CONNECT TO A PUBLICLY
OWNED SYSTEM.
(2) IN THE EVENT AN EXISTING PUBLICLY OWNED SYSTEM IS
PRESENTLY INADEQUATE TO HANDLE THE PROPOSED STATE UTILITY NEEDS,
THE STATE SHALL PAY ALL COSTS ASSOCIATED WITH THE EXPANSION OF
THE PUBLIC UTILITY SYSTEM TO MEET THE NEEDS OF THE STATE, LESS
ANY AVAILABLE FEDERAL FUNDS.
(3) PRIOR TO CONNECTING TO ANY PUBLIC UTILITY SYSTEM,
THE STATE SHALL COORDINATE ITS EFFORTS WITH THE OWNER OF THE
PUBLIC UTILITY SYSTEM AND SHALL TAKE INTO CONSIDERATION ANY
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|