clear space clear space clear space white space
A
 r c h i v e s   o f   M a r y l a n d   O n l i n e

PLEASE NOTE: The searchable text below was computer generated and may contain typographical errors. Numerical typos are particularly troubling. Click “View pdf” to see the original document.

  Maryland State Archives | Index | Help | Search
search for:
clear space
white space
Session Laws, 2006
Volume 750, Page 761   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>
clear space clear space clear space white space
ROBERT L. EHRLICH, JR., Governor                             Ch. 122 [(2)] (3) [if] IF electricity supplied by the grid exceeds electricity
generated by the eligible customer-generator during a month, the eligible
customer—generator shall be billed for the net energy supplied in accordance with
subsection (e) of this section[; and]. [(3)] (4) [if] IF electricity generated by the eligible customer-generator
exceeds the electricity supplied by the grid, the eligible customer-generator shall be
required to pay only customer charges for that month in accordance with subsection
(e) of this section. (5) (I) A AN ELIGIBLE CUSTOMER-GENERATOR UNDER PARAGRAPH (4)
OF THIS SUBSECTION MAY ACCRUE GENERATION CREDIT FOR A PERIOD NOT TO
EXCEED 12 MONTHS. (II) THE ELECTRIC COMPANY SHALL CARRY FORWARD A NEGATIVE KILOWATTS PER HOUR KILOWATT-HOUR READING UNTIL THE CUSTOMER GENERATOR BEGINS TO CONSUME ELECTRICITY FROM THE GRID: 1.       THE ELIGIBLE CUSTOMER-GENERATOR'S CONSUMPTION
OF ELECTRICITY FROM THE GRID ELIMINATES THE CREDIT; OR 2.       THE 12-MONTH ACCRUAL PERIOD UNDER
SUBPARAGRAPH (I) OF THIS PARAGRAPH EXPIRES. (III) ANY SURPLUS ENERGY GENERATED DURING THE PERIOD IN
WHICH THE CUSTOMER GENERATOR ACCRUED GENERATION CREDIT UNDER
SUBPARAGRAPH (I) OF THIS PARAGRAPH SHALL BE CREDITED, ON THE BASIS OF THE
AVERAGE AVOIDED COST OF ELECTRICITY GENERATION, TO THE ACCOUNT OF THE
CUSTOMER GENERATOR BEFORE A NEW 12-MONTH PERIOD BEGINS.
(G) FOR AN ELIGIBLE CUSTOMER-GENERATOR WHOSE FACILITY IS SIZED TO
PRODUCE ENERGY IN EXCESS OF THE ELIGIBLE CUSTOMER-GENERATOR'S ANNUAL
ENERGY CONSUMPTION. THE COMMISSION: (1)      MAY REQUIRE THE ELIGIBLE CUSTOMER-GENERATOR TO INSTALL A
DUAL METER THAT IS CAPABLE OF MEASURING THE FLOW OF ELECTRICITY IN TWO
DIRECTIONS; AND (2)      SHALL DEVELOP A CREDIT FORMULA THAT: (I)      EXCLUDES RECOVERY OF TRANSMISSION AND DISTRIBUTION
COSTS; AND (II)     PROVIDES THAT THE CREDIT MAY BE CALCULATED USING A
METHOD OTHER THAN A KILOWATT-HOUR BASIS. INCLUDING A METHOD THAT
ALLOWS A DOLLAR FOR DOLLAR OFFSET OF ELECTRICITY SUPPLIED BY THE GRID
COMPARED TO ELECTRICITY GENERATED BY THE ELIGIBLE
CUSTOMER-GENERATOR. (g) (H) (1) (i) Except as provided in subparagraph (ii) of this paragraph,
the generating capacity of an electric generating system used by an eligible
customer-generator for net metering may not exceed 200 kilowatts. - 761 -


 
clear space
clear space
white space

Please view image to verify text. To report an error, please contact us.
Session Laws, 2006
Volume 750, Page 761   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>


This web site is presented for reference purposes under the doctrine of fair use. When this material is used, in whole or in part, proper citation and credit must be attributed to the Maryland State Archives. PLEASE NOTE: The site may contain material from other sources which may be under copyright. Rights assessment, and full originating source citation, is the responsibility of the user.


Tell Us What You Think About the Maryland State Archives Website!



An Archives of Maryland electronic publication.
For information contact mdlegal@mdarchives.state.md.us.

©Copyright  October 11, 2023
Maryland State Archives