clear space clear space clear space white space
A
 r c h i v e s   o f   M a r y l a n d   O n l i n e

PLEASE NOTE: The searchable text below was computer generated and may contain typographical errors. Numerical typos are particularly troubling. Click “View pdf” to see the original document.

  Maryland State Archives | Index | Help | Search
search for:
clear space
white space
Session Laws, 2006
Volume 750, Page 3920   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>
clear space clear space clear space white space
H.B. 1588                                               VETOES REGULATION. IF FUNDING IS AVAILABLE FROM THE BAY RESTORATION FUND, A
NONFEDERAL WASTEWATER TREATMENT PLANT THAT DISCHARGES WASTEWATER
INTO THE PATUXENT RIVER OR ANY OF ITS TRIBUTARIES AND HAS A DESIGN
CAPACITY OF AT LEAST 50.000 GALLONS PER DAY SHALL UPGRADE TO ENHANCED
NUTRIENT REMOVAL, AS DEFINED UNDER § 9-1601 OF THIS ARTICLE.
(C) ON OR BEFORE JANUARY 1, 2020, UNLESS A MORE ADVANCED UPGRADE
OR UPGRADE SCHEDULE IS REQUIRED BY A STATE OR FEDERAL LAW OR
REGULATION, IF FUNDING IS AVAILABLE FROM THE BAY RESTORATION FUND, A
NONFEDERAL WASTEWATER TREATMENT PLANT THAT DISCHARGES WASTEWATER
INTO THE PATUXENT RIVER OR ANY OF ITS TRIBUTARIES AND HAS A DESIGN
CAPACITY THAT IS LESS THAN 50,000 GALLONS PER DAY SHALL UPGRADE TO
ENHANCED NUTRIENT REMOVAL, AS DEFINED UNDER § 9-1601 OF THIS ARTICLE.
(A) FOR PURPOSES OF THIS SECTION, CONCENTRATIONS AND WEIGHTS OF
PHOSPHORUS AND NITROGEN SHALL BE CALCULATED ON A DAILY BA
SIS FOR A
CALENDAR YEAR
(B) (1) FOR THE PATUXENT RIVER WATERSHED, THE TOTAL MAXIMUM
DAILY LOAD FOR NITROGEN IS 1,200 POUNDS PER DAY FROM ALL POINT SOURCE
S. (2) THE DEPARTMENT SHALL ADOPT REGULATIONS THAT ADJUST THE
CONCENTRATION IN MILLIGRAMS PER LITER AND THE FLOW IN MILLION GALLONS
PER DAY TO ENSURE THAT THE TOTAL DAILY LOAD FOR THE PATUXENT RIVER
WATER
SHED DOES NOT EXCEED THE TOTAL MAXIMUM DAILY LOAD SET FORTH IN
PARAGRAPH (1) OF THIS SUBSECTION.
(3) IN ACCORDANCE WITH PARAGRAPH (2) OF THIS SUBSECTION, THE
DEPARTMENT SHALL ISSUE A PERMIT TO A SEWAGE TREATMENT PLANT THAT
INCLUDES EFFLUENT LIMITATIONS AS DETERMINED NECESSARY TO ENSURE THAT
THE TOTAL MAXIMUM DAILY LOAD FROM ALL POINT
SOURCES IS NOT EXCEEDED. (C) ON OR BEFORE JANUARY 1, 2011, A SEWAGE TREATMENT PLANT THAT
DISCHARGES WA
STEWATER INTO THE PATUXENT RIVER OR ANY OF ITS TRIBUTARIES
SHALL IMPLEMENT THE TECHNOLOGY NECESSARY TO REMOVE; (1) PHOSPHORUS TO A LEVEL OF NOT MORE THAN 0.3 MILLIGRAM PER
LITER OF WASTEWATER EFFLUENT; AND
(2) NITROGEN TO A LEVEL OF NOT MORE THAN THE LEVEL
ESTABLISHED IN ACCORDANCE WITH SUBSECTION (B) OF THIS SECTION.
9-326. (a) (1) [The] EXCEPT AS PROVIDED IN PARAGRAPH (2) OF THIS
SUBSECTION, THE Department may make the issuance of a discharge permit
contingent on any conditions the Department considers necessary to prevent violation
of this subtitle.
(2) (I) FOR THE PATUXENT RIVER WATERSHED, AS DEFINED IN § 4-301
OF THIS ARTICLE, THE DEPARTMENT SHALL IMPOSE A CAP ON THE TOTAL POINT
SOURCE LOAD FOR NITROGEN THAT DOES NOT EXCEED 1,200 POUNDS PER DAY.
- 3920 -


 
clear space
clear space
white space

Please view image to verify text. To report an error, please contact us.
Session Laws, 2006
Volume 750, Page 3920   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>


This web site is presented for reference purposes under the doctrine of fair use. When this material is used, in whole or in part, proper citation and credit must be attributed to the Maryland State Archives. PLEASE NOTE: The site may contain material from other sources which may be under copyright. Rights assessment, and full originating source citation, is the responsibility of the user.


Tell Us What You Think About the Maryland State Archives Website!



An Archives of Maryland electronic publication.
For information contact mdlegal@mdarchives.state.md.us.

©Copyright  October 11, 2023
Maryland State Archives