H.B. 1126 VETOES
|
|
|
|
|
|
|
(ii) "Program" includes any amendments to the program.
[(15)] (16) (i) "Program amendment" means any change OR PROPOSED
CHANGE to an adopted program [that the Commission determines will result in a use
of land or water in the Chesapeake Bay Critical Area or the Atlantic Coastal Bays
Critical Area in a manner not provided for in the adopted program] THAT IS NOT
DETERMINED BY THE COMMISSION CHAIRMAN TO BE A PROGRAM REFINEMENT.
(ii) "Program amendment" includes a change to a zoning map that
is not consistent with the method for using the growth allocation contained in an
adopted program.
[(16)] (17) (i) "Program refinement" means any change OR PROPOSED
CHANGE to an adopted program that the Commission CHAIRMAN determines will
result in a use of land or water in the Chesapeake Bay Critical Area or the Atlantic
Coastal Bays Critical Area in a manner consistent with the adopted program, OR
THAT WILL NOT SIGNIFICANTLY AFFECT THE USE OF LAND OR WATER IN THE
CRITICAL AREA.
(ii) "Program refinement" [includes] MAY INCLUDE:
1. A change to [a zoning map that is consistent with the
development area designation of] an adopted program THAT RESULTS FROM STATE
LAW; [and]
2. [The use of the growth allocation in accordance with an
adopted program] A CHANGE TO AN ADOPTED PROGRAM THAT AFFECTS LOCAL
PROCESSES AND PROCEDURES;
3. A CHANGE TO A LOCAL ORDINANCE OR CODE THAT
CLARIFIES AN EXISTING PROVISION; AND
4. A MINOR CHANGE TO AN ELEMENT OF AN ADOPTED
PROGRAM THAT IS CLEARLY CONSISTENT WITH THE PROVISIONS OF THIS SUBTITLE
AND ALL OF THE CRITERIA OF THE COMMISSION.
[(17)] (18) (i) "Project approval" means the approval of development,
other than development by a State or local government agency, in the Chesapeake
Bay Critical Area or the Atlantic Coastal Bays Critical Area by the appropriate local
approval authority.
(ii) "Project approval" includes:
1. Approval of subdivision plats and site plans;
2. Inclusion of areas within floating zones;
3. Issuance of variances, special exceptions, and conditional
use permits; and
4. Approval of rezoning.
(iii) "Project approval" does not include building permits.