|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HARRY HUGHES, Governor
Equipment....................................
Equipment....................................
(2) Preparation of detailed plans and
specifications and construction of a
replacement facility within the enhanced
secured area at the Maryland Training School.
The replacement facility shall contain
individual living units, and program space,
Construction of the replacement facility
shall not begin until the security
enhancements on the Fletcher Campus are
completed and either the Youth Center to be
located at Meadow Mountain in Garrett County
or the Youth Center to be located in Charles
County or the Youth Center to be located at
the Henryton Center in Carroll County is
completed, provided, however, that
construction shall begin on or after April 1,
1984. After construction of the replacement
facility is completed, the existing cottage
(Unit #13) nearest the school building on the
Pratt Campus shall be razed and a portion of
this appropriation may be used for that
purpose. Representatives of the Juvenile
Services Administration, Department of State
Planning, and Department of General Services
shall meet with appropriate community groups
within the vicinity of the Maryland Training
School not later than September 1, 1983.
(Baltimore County)............................
(b) Youth Centers:
(1) Design, prepare detailed plans and
specifications for, and construct an addition
to the existing dormitory, and renovate the
existing dormitory, at Maple Run Youth Center
(Allegany County).............................
(2) (1) Design, prepare detailed plans and
specifications for,, and construct a physical
activities building at Savage Mountain Youth
Center (Garrett County)......................
(2) Design and construct water and sewer systems,
a gymnasium, not to exceed 2,600 gross square
feet, and make minor repairs to a 40-bed
Youth Center at Meadow Mountain Conservation
Center (Garrett County). This appropriation
is contingent upon certification by the
Department of Health and Mental Hygiene to
the Budget Committees that there exists a
sufficient volume of water at the site to
support the facility.........................
|
|
|
|
|
|
|
|
|
|
|
|
2,173,000
|
|
|
216,000
|
|
|
195,000
|
|
|
735,000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|