clear space clear space clear space white space
A
 r c h i v e s   o f   M a r y l a n d   O n l i n e

PLEASE NOTE: The searchable text below was computer generated and may contain typographical errors. Numerical typos are particularly troubling. Click “View pdf” to see the original document.

  Maryland State Archives | Index | Help | Search
search for:
clear space
white space
Session Laws, 1975
Volume 716, Page 2802   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>
clear space clear space clear space white space

2802

LAWS OF MARYLAND

[Ch. 581

(4)    A STATEMENT SUMMARIZING ANY PROBLEMS
ENCOUNTERED DURING THE PROGRESS OF MINING WORK OR
RECLAMATION WORK, AND THE MEASURES TAKEN TO CORRECT THESE
PROBLEMS;

(5)    THE TOTAL ACREAGE OF LAND DISTURBED AND
RECLAIMED;

[[(6) THE TOTAL VOLUME IN CUBIC YARDS OR TONS
OF MINERALS PRODUCED;]]

[[(7)]] (6) THE STATUS OR CONDITION OF AREAS
PROGRESSIVELY RECLAIMED SINCE THE INITIATION OF MINING
WORK IN THE AREA; AND

[[(8)]] (7) A FINAL SURVEYED TOPOGRAPHIC MAP
PREPARED AND CERTIFIED BY A REGISTERED PROFESSIONAL
ENGINEER OR SURVEYOR, DRAWN AT THE SAME SCALE AND CONTOUR
INTERVAL AS THE ORIGINAL HAP SUBMITTED WITH THE MINING
AND RECLAMATION PLAN.

[[7-7B28]] 7-6A28. SPECIFICATIONS FOR CONSTRUCTION
PROJECTS.

ARCHITECTS, ENGINEERS, OR OTHER PERSONS PREPARING
SPECIFICATIONS FOR CONSTRUCTION PROJECTS, WHICH
SPECIFICATIONS INCLUDE THE REQUIREMENT THAT THE
CONSTRUCTION CONTRACTOR SUPPLY FILL FOR THE PROJECT,
SHALL INCLUDE WITHIN THE SPECIFICATIONS A SPECIFIC
REFERENCE TO THIS SUBTITLE AND THE RULES AND REGULATIONS
PERTAINING TO IT ADOPTED BY THE DEPARTMENT. IF THIS
REFERENCE IS OMITTED FROM THE SPECIFICATIONS AND
RECLAMATION AND PLANTING OF THE LAND IS REQUIRED UNDER
THIS SUBTITLE, ANY CONTRACT BASED ON THE SPECIFICATIONS
MAY BE AMENDED, AT THE OPTION OF THE CONSTRUCTION
CONTRACTOR, TO ALLOW A REASONABLE PRICE FOR THE
RECLAMATION AND PLANTING OF THE LAND IN ACCORDANCE WITH A
PLAN ACCEPTABLE TO THE DEPARTMENT.

[[7-7B29]] 7-6A29. INJUNCTIONS.

ON APPLICATION OF THE DEPARTMENT, VERIFIED BY OATH
OR AFFIRMATION, THE CIRCUIT COURT OF THE COUNTY OR CITY
WHERE THE MINING OPERATION IS LOCATED, SITTING IN EQUITY,
MAY ENFORCE BY INJUNCTION COMPLIANCE WITH, OR RESTRAIN
THE VIOLATION OF ANY ORDER, NOTICE, RULE, OR REGULATION
OF THE DEPARTMENT MADE PURSUANT TO THE PROVISIONS OF THIS
SUBTITLE OR RESTRAIN THE VIOLATION OR ATTEMPTED VIOLATION
OF ANY OF THE PROVISIONS OF THIS SUBTITLE.

[[7-7B30]] 7-6A30. INAPPLICABILITY OF SUBTITLE.

THIS SUBTITLE, INCLUDING RECLAMATION REQUIREMENTS,
DOES NOT APPLY TO SURFACE MINING OPERATIONS OR MINED

 

clear space
clear space
white space

Please view image to verify text. To report an error, please contact us.
Session Laws, 1975
Volume 716, Page 2802   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>


This web site is presented for reference purposes under the doctrine of fair use. When this material is used, in whole or in part, proper citation and credit must be attributed to the Maryland State Archives. PLEASE NOTE: The site may contain material from other sources which may be under copyright. Rights assessment, and full originating source citation, is the responsibility of the user.


Tell Us What You Think About the Maryland State Archives Website!



An Archives of Maryland electronic publication.
For information contact mdlegal@mdarchives.state.md.us.

©Copyright  October 11, 2023
Maryland State Archives