clear space clear space clear space white space
A
 r c h i v e s   o f   M a r y l a n d   O n l i n e

PLEASE NOTE: The searchable text below was computer generated and may contain typographical errors. Numerical typos are particularly troubling. Click “View pdf” to see the original document.

  Maryland State Archives | Index | Help | Search
search for:
clear space
white space
Session Laws, 1975
Volume 716, Page 2801   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>
clear space clear space clear space white space

MARVIN MANDEL, Governor

2801

IN FACT IS NOT ABANDONED AND A REASONABLE TIMETABLE
SATISFACTORY TO THE DEPARTMENT REGARDING PLANS FOR THE
REACTIVATION OF THE OPERATION, THE DEPARTMENT SHALL
DECLARE THE OPERATION ABANDONED AND INITIATE LEGAL
PROCEEDINGS AGAINST THE OPERATOR.

(B) AN OPERATION IS CONSIDERED HALTED IF ACTIVE
WORK HAS CEASED TEMPORARILY DOE TO WEATHER CONDITIONS,
MARKET CONDITIONS, OR OTHER REASONABLE CAUSE EXPLAINED IN
WRITING BY THE OPERATOR TO THE SATISFACTION OF THE
DEPARTMENT, AND ACCOMPANIED BY A STATEMENT THAT THE
OPERATOR FULLY INTENDS TO RESUME ACTIVE OPERATION WHEN
THE ADVERSE CONDITIONS HAVE PASSED. ALL NECESSARY
POLLUTION CONTROLS SHALL BE PROPERLY MAINTAINED DURING
THIS PERIOD. NO OPERATION MAY BE HALTED FOR A PERIOD
EXCEEDING 24 CONSECUTIVE MONTHS, AFTER WHICH TIME MINING
ACTIVITY SHALL BE RESUMED OR FINAL RECLAMATION WORK SHALL
BE COMMENCED. ON FAILURE OF THE OPERATOR TO RESUME
MINING OR INITIATE RECLAMATION, THE DEPARTMENT SHALL
DECLARE THE OPERATION ABANDONED AND INITIATE LEGAL
PROCEEDINGS AGAINST THE OPERATOR.

[[7-7B27]] 7-6A27. FINAL COMPLETION INSPECTION AND
REPORT.

(A)    ON COMPLETION OF RECLAMATION OF AN AREA OF
AFFECTED LAND, THE OPERATOR IMMEDIATELY SHALL NOTIFY THE
DEPARTMENT. THE DEPARTMENT SHALL MAKE AN INSPECTION OF
THE AREA, AND IF IT FINDS THAT THE OPERATOR HAS NOT
COMPLETED TO THE DEPARTMENTS REASONABLE SATISFACTION ALL
THE RECLAMATION REQUIRED BY THE PERMIT, THE DEPARTMENT
SHALL ORDER THE OPERATOR TO DO SO AT ONCE AND SHALL
REINSPECT THE AREA FOLLOWING COMPLETION OF THE WORK. IF
THE DEPARTMENT FINDS THAT RECLAMATION HAS BEEN COMPLETED
PROPERLY, IT SHALL NOTIFY THE OPERATOR IN WRITING AND
RELEASE HIM FROM FURTHER OBLIGATIONS REGARDING THE
AFFECTED LAND. AT THE SAME TIME IT SHALL RELEASE ALL OR
THE APPROPRIATE PORTION OF ANY PERFORMANCE BOND OR CASH
DEPOSIT WHICH THE OPERATOR HAS POSTED UNDER §[[7-7B20]]
7-6A20.

(B)   WITHIN SIX MONTHS FOLLOWING THE COMPLETION OF
FINAL RECLAMATION WORK THE OPERATOR SHALL FURNISH A FINAL
RECLAMATION REPORT WHICH INCLUDES THE FOLLOWING:

(1)    THE TERMS OF THE ORIGINAL SURFACE MINING
PERMIT AND ALL SUBSEQUENT MODIFICATIONS;

(2)   A SUMMARY OF THE ORIGINAL MINING AND
RECLAMATION PLAN AND ALL SUBSEQUENT MODIFICATIONS;

(3)    A STATEMENT SUMMARIZING ANY DEPARTURES
FROM THE MINING AND RECLAMATION PLAN AND THE REASONS FOR
THEM;

 

clear space
clear space
white space

Please view image to verify text. To report an error, please contact us.
Session Laws, 1975
Volume 716, Page 2801   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>


This web site is presented for reference purposes under the doctrine of fair use. When this material is used, in whole or in part, proper citation and credit must be attributed to the Maryland State Archives. PLEASE NOTE: The site may contain material from other sources which may be under copyright. Rights assessment, and full originating source citation, is the responsibility of the user.


Tell Us What You Think About the Maryland State Archives Website!



An Archives of Maryland electronic publication.
For information contact mdlegal@mdarchives.state.md.us.

©Copyright  October 11, 2023
Maryland State Archives