Schedule Dialog
(WilburUtil)


Right clicking the WilburUtil icon on the system tool tray

tooltray.gif (1140 bytes)

and selecting Schedule will result in the following dialog appearing:

scheduledlg.gif (13371 bytes)

The main list box contains all of the scheduled events. To add a new one, simply click on the Add button:

scheduleitem.gif (12971 bytes)

  1. Click on the browse button to select the index you wish to build or update.

  2. Enter the time for the first run.  For instance 7 pm or 19:00 or 3:45 am.  It is probably a good idea to try and select times such that two events don't overlap.

  3. Select the interval between runs.  Enter the number in the interval box and click on the unit (Day, Hour, or Minute).

  4. If you wish to do an update rather than a full build, check the Just Update box.

  5. Press OK to add this item to the schedule list.

Back on the main schedule list dialog, selecting an entry clicking on Edit allows the item parameters to be changed.

Clicking on Remove will delete the selected item from the list.

You must click OK to save the changes to the list.  If you wish to abandon all changes, click on Cancel.


Copyright © 1999 RedTree Development Inc. All rights reserved.
Information in this document is subject to change without notice.
Other products and companies referred to herein are trademarks or registered trademarks of their respective companies or mark holders.