clear space clear space clear space white space
A
 r c h i v e s   o f   M a r y l a n d   O n l i n e
  Maryland State Archives | Index | Help | Search search for:
clear space
white space
Session Laws, 2004
Volume 801, Page 2285   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>
clear space clear space clear space white space

ROBERT L. EHRLICH, JR., Governor                             Ch. 488

(9)      IN 2014, 5% FROM TIER 1 RENEWABLE SOURCES AND 2.5% FROM TIER
2 RENEWABLE SOURCES;

(10)    IN 2015, 5.5 5% FROM TIER 1 RENEWABLE SOURCES AND 2% 2.5%
FROM TIER 2 RENEWABLE SOURCES;

(11)    IN 2016, 6% FROM TIER 1 RENEWABLE SOURCES AND 1.5% 2.5% FROM
TIER 2 RENEWABLE SOURCES;

(12)    IN 2017, 6.5 6% FROM TIER 1 RENEWABLE SOURCES AND 1% 2.5%
FROM TIER 2 RENEWABLE SOURCES;

(13)    IN 2018, 7% FROM TIER 1 RENEWABLE SOURCES AND 0.5% 2.5% FROM
TIER 2 RENEWABLE SOURCES; AND

(14)    IN 2019 AND LATER, 7.5% FROM TIER 1 RENEWABLE SOURCES AND 0%
FROM TIER 2 RENEWABLE SOURCES.

(C)     BEFORE CALCULATING THE NUMBER OF CREDITS REQUIRED TO MEET
THE PERCENTAGES ESTABLISHED UNDER SUBSECTION (B) OF THIS SECTION, AN
ELECTRICITY SUPPLIER SHALL EXCLUDE FROM ITS TOTAL RETAIL ELECTRICITY
SALES ALL RETAIL ELECTRICITY SALES DESCRIBED IN SUBSECTION (A)(2) OF THIS
SECTION.

(D)     SUBJECT TO SUBSECTIONS (A) AND (C) OF THIS SECTION, AN ELECTRICITY
SUPPLIER SHALL MEET THE RENEWABLE ENERGY PORTFOLIO STANDARD BY
ACCUMULATING THE EQUIVALENT AMOUNT OF RENEWABLE ENERGY CREDITS THAT
EQUAL THE PERCENTAGE REQUIRED UNDER THIS SECTION.

7-704.

(A) (1) ENERGY FROM A TIER 1 RENEWABLE SOURCE:

(I)      IS ELIGIBLE FOR INCLUSION IN MEETING THE RENEWABLE
ENERGY PORTFOLIO STANDARD REGARDLESS OF WHEN THE GENERATING SYSTEM
OR FACILITY WAS PLACED IN SERVICE; AND

(II)     MAY BE APPLIED TO THE PERCENTAGE REQUIREMENTS OF THE
STANDARD FOR EITHER TIER 1 RENEWABLE SOURCES OR ITER 2 RENEWABLE
SOURCES.

(2) ENERGY FROM A TIER 1 RENEWABLE SOURCE UNDER § 7-701(L)(8) OF
THIS SUBTITLE IS ELIGIBLE FOR INCLUSION IN MEETING THE RENEWABLE ENERGY
PORTFOLIO IF IT IS GENERATED AT A DAM THAT EXISTED AS OF JANUARY 1, 2004.
EVEN IF A SYSTEM OR FACILITY THAT IS CAPABLE OF GENERATING ELECTRICITY
DID NOT EXIST ON THAT DATE.

(2) (3) (I) ENERGY FROM A TIER 2 RENEWABLE SOURCE UNDER §
7-701(L)(1) 7-701(M)(1) OR (3) OF THIS SUBTITLE IS ELIGIBLE FOR INCLUSION IN
MEETING THE RENEWABLE ENERGY PORTFOLIO STANDARD THROUGH 2018 IF IT IS
GENERATED AT A SYSTEM OR FACILITY THAT EXISTED AND WAS OPERATIONAL AS OF
JANUARY 1, 2004, EVEN IF THE FACILITY OR SYSTEM WAS NOT CAPABLE OF
GENERATING ELECTRICITY ON THAT DATE.

- 2285 -

 

clear space
clear space
white space

Please view image to verify text. To report an error, please contact us.
Session Laws, 2004
Volume 801, Page 2285   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>


This web site is presented for reference purposes under the doctrine of fair use. When this material is used, in whole or in part, proper citation and credit must be attributed to the Maryland State Archives. PLEASE NOTE: The site may contain material from other sources which may be under copyright. Rights assessment, and full originating source citation, is the responsibility of the user.


Tell Us What You Think About the Maryland State Archives Website!



An Archives of Maryland electronic publication.
For information contact mdlegal@mdarchives.state.md.us.

©Copyright  October 11, 2023
Maryland State Archives