Volume 796, Page 110 View pdf image |
(4) (i) The Commission shall ensure presentation and (ii) The Commission shall allow each State unit 15 days after the (e) The Commission shall take final action on an application for a certificate of (1) the recommendation of the governing body of each county or (2) [the need to meet existing and future demand for electric service; and (3)] the effect of the generating station or overhead transmission line on: (i) the stability and reliability of the electric system; (iv) historic sites; (v) aviation safety as determined by the Maryland Aviation (vi) when applicable, air and water pollution; and (vii) the availability of means for the required timely disposal of (f) FOR THE CONSTRUCTION OF AN OVERHEAD TRANSMISSION LINE, IN (G) (1) The Commission may not authorize, and an electric company may not (i) the Federal Aviation Administration determines that the (ii) the Maryland Aviation Administration concurs in that determination.
|
||||
Volume 796, Page 110 View pdf image |
Tell Us What You Think About the Maryland State Archives Website!
|
An Archives of Maryland electronic publication.
For information contact
msa.helpdesk@maryland.gov.