Volume 773, Page 1616 View pdf image |
Ch. 208 1994 LAWS OF MARYLAND (iii) After receipt of a notice from a contractor of an intent to excavate (iv) Notify the contractor within 48 hours (excluding Saturdays, (v) Mark the location of an underground facility within 18 inches on a (vi) Use the following color code when marking the location of an UTILITY TYPE AND PRODUCT SPECIFIC GROUP IDENTIFYING COLOR Electric power distribution Safety red and transmission Municipal electric systems Safety red Gas distribution and High visibility safety transmission yellow Oil distribution and High visibility safety transmission yellow Dangerous materials, High visibility safety product lines, and yellow steam lines Telephone and Safety alert orange telecommunications Cable television Safety alert orange Water systems Safety precaution blue Sewer lines Safety green; (vii) Notify the contractor of the date and time when a location will be (viii) Excavate around an underground facility in a timely manner if the (ix) Notify the contractor within 48 hours (excluding Saturdays, 1. The owner does not have an underground facility at the 2. The proposed excavation is not planned within 5 feet of the - 1616 -
|
||||
Volume 773, Page 1616 View pdf image |
Tell Us What You Think About the Maryland State Archives Website!
|
An Archives of Maryland electronic publication.
For information contact
mdlegal@mdarchives.state.md.us.