WILLIAM DONALD SCHAEFER, Governor
Ch. 98
Section 1(3)(C)(3)
(j) Susquehanna State Park (Cecil and Harford
Counties):
Construct storage building AND COMFORT
STATION at J. Gilman Paul Interpretive Farm
and construct a new gift shop and canning
house museum and connect lines at Stepping
Stone Museum....................................
Section 1(3)(G)(5)
[(a) Horn Point Environmental Laboratories:
(Dorchester County):]
[(1)] (A) Design and prepare detailed plans and
specifications for installation of expanded
system for pumping Choptank River water to
research facilities AT HORN POINT
ENVIRONMENTAL LABORATORIES (DORCHESTER
COUNTY).........................................
[(2)] (B) Design and prepare detailed plans and
specifications for Hazardous Chemical Waste
Storage [Facility and for building and site
modifications to improve safety and security]
FACILITIES AT HORN POINT ENVIRONMENTAL
LABORATORIES (DORCHESTER COUNTY) AND AT
CHESAPEAKE BIOLOGICAL LABORATORY (CALVERT
COUNTY).........................................
Chapter 542 of the Acts of 1988
Section 1
(1) The Board of Public Works may borrow money
and incur indebtedness on behalf of the State
of Maryland through a State loan to be known
as the General Construction Loan of 1988 in
the total principal amount of [$111,541,000]
$110,691,000. This loan shall be evidenced by
the issuance, sale, and delivery of State
general obligation bonds authorized by a
resolution of the Board of Public Works and
issued, sold, and delivered in accordance
with §§ 8-117 through 8-124 of the State
Finance and Procurement Article and Article
31, § 22 of the Code.
Section 1(3)(E)(2)
(b) [Renovate] CONSTRUCT NEW swimming pool..........
- 1797 -
360,000
50,000
75,000
300,000
|