clear space clear space clear space white space
A
 r c h i v e s   o f   M a r y l a n d   O n l i n e
  Maryland State Archives | Index | Help | Search search for:
clear space
white space
Session Laws, 1985
Volume 760, Page 3792   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>
clear space clear space clear space white space

3792

VETOES

weeks, and which includes the ownership of the land affected, a
description of the location and boundaries of the proposed site
sufficient so that the proposed operation is easily locatable by
local residents, the location of where the application is
available for public inspection, and notice that public comment
will be received by the Department for at least 30 days after the
last newspaper publication;

(2)  A U. S. Geological Survey quadrangle sheet, 7 1/2
minute series enlarged to a scale satisfactory to the Department
showing the location of the land affected by the contemplated
operation. The map shall be prepared and certified by a
registered engineer or registered surveyor approved by the
Department. It shall show the boundaries of the area of land
which will be affected, the drainage area above and below the
area, the location and names of all streams, roads, railroads,
buildings, and utility lines on or immediately adjacent to the
area, the name of the owner of the area, the boundaries and names
of the owners of all surface areas abutting the permit area, and
the nearest municipality;

(3)  The results of test borings which the operator
has conducted at the site of the proposed operation. The
application shall include data such as the nature and depth of
the overburden, the thickness of the coal seam, a complete
analysis of the coal seam and soil samples, the crop line and
strike and dip of the coal seam, and the location of the test
boring holes;

(4)  A determination of the probable hydrologic
consequences of the mining and reclamation operations upon
surface and ground waters both on and off the permit area. The
cost of analysis of test borings or core samplings and the
determination of probable hydrologic consequences may be assumed
by the Department upon the request of an operator if the
Department determines that the projected total annual production
by the operator at all permits is less than 100,000 tons.
Information pertaining to the coal seam, test borings, core
samples and soil samples shall be available to the public except
that information as to the chemical and physical properties of
the coal seam other than its potential toxicity shall be
confidential.

(5)  A certificate stating that the applicant has a
liability insurance policy for the operation for which the permit
is sought in such amount as the Department determines to be
necessary to compensate any person injured or damaged by the
operation.

(6)  A permit fee of $10.

(7)  A detailed mining and reclamation plan showing at
a minimum, the method for construction of all haul roads, the
method for removing and stockpiling topsoil material, the method

 

clear space
clear space
white space

Please view image to verify text. To report an error, please contact us.
Session Laws, 1985
Volume 760, Page 3792   View pdf image
 Jump to  
  << PREVIOUS  NEXT >>


This web site is presented for reference purposes under the doctrine of fair use. When this material is used, in whole or in part, proper citation and credit must be attributed to the Maryland State Archives. PLEASE NOTE: The site may contain material from other sources which may be under copyright. Rights assessment, and full originating source citation, is the responsibility of the user.


Tell Us What You Think About the Maryland State Archives Website!



An Archives of Maryland electronic publication.
For information contact mdlegal@mdarchives.state.md.us.

©Copyright  August 17, 2024
Maryland State Archives