|
2246 LAWS OF MARYLAND Ch. 240
PENDING THE INSTALLATION OF A PROGRAMMED COLLECTION AND
TRANSPORTATION SYSTEM.
REVISOR'S NOTE: This section formerly appeared as
Article 43, § 387C(b)3.
The only changes are in style.
9-505. SAME — ADDITIONAL CONTENTS REQUIRED.
(A) MIN GENERAL.
IN ADDITION TO THE OTHER REQUIREMENTS OF THIS SUBTITLE,
EACH COUNTY PLAN SHALL:
(1) PROVIDE FOR THE ORDERLY EXPANSION AND
EXTENSION OF COMMUNITY AND MULTIUSE WATER SUPPLY SYSTEMS,
COMMUNITY AND MULTIUSE SEWERAGE SYSTEMS, AND SOLID WASTE
DISPOSAL SYSTEMS IN A MANNER CONSISTENT WITH ALL APPLICABLE
COUNTY AND LOCAL COMPREHENSIVE LAND USE PLANS (SIZING AND
STAGING OF FACILITIES CONSTRUCTION SHALL BE CONSISTENT WITH
THESE PLANS) AND DEMONSTRATE THIS THROUGH THE USE OF GRAPHIC
AND TABULAR INFORMATION;
(2) PROVIDE FOR ADEQUATE SEWAGE TREATMENT
FACILITIES THAT WILL PREVENT THE DISCHARGE OF UNTREATED OR
INADEQUATELY TREATED SEWAGE OR OTHER WASTE OF A LIQUID
NATURE INTO ANY WATERS, OR OTHERWISE PROVIDE FOR THE SAFE
AND SANITARY TREATMENT OF SEWAGE AND OTHER LIQUID WASTE;
(3) PROVIDE FOR ADEQUATE FACILITIES FOR THE
TREATMENT, RECOVERY, OR DISPOSAL OF SOLID WASTES IN A MANNER
THAT IS CONSISTENT WITH THE LAWS OF THIS STATE RELATING TO
AIR POLLUTION, WATER POLLUTION, AND LAND USE;
(4) CONTAIN ADEQUATE INFORMATION ABOUT THE
EXISTING SEWAGE TREATMENT CAPACITY WITHIN EACH DRAINAGE
BASIN OR SEWAGE TREATMENT PLANT SERVICE AREA IN THE COUNTY,
THE PRESENT LEVEL OF USE IN EACH DRAINAGE BASIN, AND
PROJECTIONS FOR USE OF SEWAGE TREATMENT PLANT CAPACITY BASED
ON OUTSTANDING BUILDING PERMITS AND SUBDIVISION PLATS, OR,
IF THE COUNTY DOES NOT HAVE OR IS NOT UTILIZING SUBDIVISION
AUTHORITY, PROJECTIONS BASED UPON ZONING COMMITMENTS;
(5) DELINEATE WITH ALL PRACTICAL PRECISION THOSE
PARTS OF THE COUNTY THAT COMMUNITY AND MULTIUSE WATER SUPPLY
SYSTEMS, COMMUNITY AND MULTIUSE SEWERAGE SYSTEMS, AND
COMMUNITY SOLID WASTE DISPOSAL SYSTEMS MAY REASONABLY BE
EXPECTED TO SERVE WITHIN THE SUCCEEDING 10-YEAR PERIOD, AND
ANY PARTS IN WHICH THE PROVISION OF THESE SERVICES IS NOT
REASONABLY FORESEEABLE, TAKING INTO CONSIDERATION ALL
RELATED ASPECTS OF PLANNING, ZONING, POPULATION ESTIMATES,
ENGINEERING, AND ECONOMICS, AND ALL STATE, REGIONAL,
MUNICIPAL, AND LOCAL PLANS;
|