LAWS OF MARYLAND
[Ch. 537
shall have the following meanings, unless the context
clearly indicates that another meaning was intended.
The specific items included within the following terns
shall not be deemed to limit the generality of those
terms.
(b) The term "airport facilities" shall include
any one or more or combination of lands, airfield
improvements, terminal area improvements, general
aviation facilities, air cargo facilities, general site
improvements, utilities, roads, streets, parking lots,
and all other facilities necessary or useful in
connection with the operation of a modern airport end
every and all other appurtenances and equipment now in
use or hereafter designed for use in the handling of air
carrier service, general aviation activities and others
at any location within the State.
(c) The term "bonds of prior issues" shall mean
all "State highway construction bonds, second issue," and
"State highway construction bonds, third issue," issued
and sold under the provisions of Article 89B, of the
Code, title "State Roads," and all bonds issued and sold
under the provisions of Article 62B of the Code, title
"Maryland Port Authority" evidencing the State loans
known as "Maryland Port Authority Loan of 1958,"
"Maryland Port Authority Second Loan of 1961" and
"Maryland Port Authority Loan of 1967." The term
"revenue bonds of prior issues" shall mean State of
Maryland bridge and tunnel revenue bonds (dated as of
October 1, 1954), State of Maryland Northeastern
Expressway revenue bonds (dated as of January 1, 1962),
State of Maryland bridge and tunnel revenue bonds (Series
1968) (dated as of October 1, 1968) and Maryland Port
Authority revenue bonds (Series 1958A) (dated as of
October 1, 1958).
(d) The term "Code" shall mean the 1957 Edition of
the Annotated Code of Maryland, as replaced, amended and
supplemented from time to time.
(e) The term "cost" as applied to transportation
facilities or any transportation facilities project shall
include the cost of construction, reconstruction,
acquisition, improvement, extension, alteration,
modernization, planning, maintenance and repair of any
such facilities or project, including the cost of all
interests in property acquired in connection therewith,
any financing charges and interest prior to, during and
for one year after completion of construction, financial,
architectural, consulting, engineering and legal
services, plans, specifications, surveys, estimates,
feasibility reports, direct and indirect labor,
materials, equipment and administrative expenses, and all
|
|