2092 LAWS OF MARYLAND [Ch. 619
[(VI)] (VIII) Individual sewerage systems may be
installed and used for an indefinite period. In Harford
County, within the areas outlined in the county plan to
receive community sewerage system within ten years, any
new subdivisions approved after June 1, 1972, must have a
county approved sewerage collection system as a
prerequisite for the issuance of building and zoning
permits.
[(VII)] (IX) Community solid waste disposal systems
must be provided.
[(VIII)] (X) Community solid waste acceptance
facilities must be provided for use by the residents of
the community pending the installation of a programmed
collection and transportation system.
4. In addition, every county plan shall—
(i) Provide for the orderly expansion and extension
of community AND MULTI—USE water supply systems,
community AND MULTI—USE sewerage systems and solid waste
disposal systems in a manner consistent with [the needs
and plans of the area;] ALL APPLICABLE [[STATE,]] COUNTY
AND LOCAL COMPREHENSIVE LAND USE PLANS AND SIZING AND
STAGING OF FACILITIES CONSTRUCTION SHALL BE CONSISTENT
WITH THESE PLANS. THE PLAN SHALL DEMONSTRATE THIS
THROUGH THE USE OF GRAPHIC AND TABULAR INFORMATION.
(ii) Provide for adequate sewage treatment
facilities which will prevent the discharge of untreated
or inadequately treated sewage or other waste of a liquid
nature into any waters, or otherwise provide for the safe
and sanitary treatment of sewage and other liquid waste;
(iii) Provide for adequate facilities for the
treatment, recovery or disposal of solid wastes in a
manner that is consistent with the laws of this State
relating to air pollution, water pollution and land use;
(iv) - CONTAIN ADEQUATE INFORMATION OF THE EXISTING
SEWAGE TREATMENT CAPACITY WITHIN EACH DRAINAGE BASIN OR
SEWAGE TREATMENT PLANT SERVICE AREA WITHIN THE COUNTY,
THE PRESENT LEVEL OF USE WITHIN EACH DRAINAGE BASIN AND
PROJECTIONS FOR USE OF SEWAGE TREATMENT PLANT CAPACITY
BASED UPON OUTSTANDING BUILDING PERMITS AND SUBDIVISION
PLATS, OR, WHERE THE COUNTY DOES NOT HAVE OR IS NOT
UTILIZING SUBDIVISION AUTHORITY, PROJECTIONS BASED UPON
ZONING COMMITMENTS.
[[ (iv) ]] (v) Delineate with all practical precision
those portions of the county which community AND
MULTI-USE water supply systems, community AND MULTI-USE
sewerage systems and community solid waste disposal
|