clear space clear space clear space white space
A
 r c h i v e s   o f   M a r y l a n d   O n l i n e

PLEASE NOTE: The searchable text below was computer generated and may contain typographical errors. Numerical typos are particularly troubling. Click “View pdf” to see the original document.

  Maryland State Archives | Index | Help | Search
search for:
clear space
white space
Maryland Manual, 1959-60
Volume 168, Page 30   View pdf image (33K)
 Jump to  
  << PREVIOUS  NEXT >>
clear space clear space clear space white space
30 MARYLAND MANUAL

Many of these projects have already been completed. Out-
standing among them is the Chesapeake Bay Bridge, cross-
ing four miles of water and allowing clearance for craft
to a height of 187 feet. It was completed July 30, 1952, at a
cost of $45,000,000 and is the largest continuous over-water
steel structure in the world. Another remarkable engineer-
ing feat, the Baltimore Harbor Tunnel, was opened to traffic
at midnight November 29, 1957. Built at a cost of $130,000,-
000, it is 6,300 feet long and has in all, sixteen miles of
approach expressways that enable the motorist to speed
rapidly through one of the most highly congested areas
of Baltimore.

The Baltimore-Washington Expressway opened early in
1954. The Blue Star Highway, extending from the Chesa-
peake Bay Bridge to the Delaware line, was completed in
1956. The Washington National Pike, one of the most beau-
tiful highways in the country, has been finished between
Rockville and Frederick. Motorists may now travel about
two-thirds of the distance between Annapolis and Washing-
ton on the John Hanson Highway, while segments of the
Baltimore Beltway and the Washington Circumferential
Highway are already in use.

Spurred by a series of shocking revelations published in
one of Baltimore's leading newspapers in 1949, the General
Assembly established the Department of Mental Hygiene
and gave it full supervision over all matters pertaining to
the custody, care and treatment of persons of unsound mind.
Since then the State has spent millions of dollars erecting
new buildings and improving existing facilities. More im-
portant, there has been a change in concept which regards
such institutions as treatment centers rather than as deten-
tion areas. Patuxent Institution, an experiment in the use
of indeterminate sentences in the treatment of defective
delinquents, began operating in 1955. A 300-bed Maximum
Security Hospital was completed in 1959 at a cost of nearly
three million dollars. By 1960, it will be in operation, in-
augurating in Maryland a program of psychiatric therapies
correlated with rehabilitative procedures for all adult male
patients who require maximum security.

At Rosewood Training School, the Esther Loring Rich-
ards Children's Center was opened in 1958 to provide
psychiatric treatment for children under fourteen with
serious emotional illnesses as distinct from those who are
mentally retarded.

Other medical facilities have also been constructed. Three
chronic disease hospitals have been opened: Deer's Head

 

clear space
clear space
white space

Please view image to verify text. To report an error, please contact us.
Maryland Manual, 1959-60
Volume 168, Page 30   View pdf image (33K)
 Jump to  
  << PREVIOUS  NEXT >>


This web site is presented for reference purposes under the doctrine of fair use. When this material is used, in whole or in part, proper citation and credit must be attributed to the Maryland State Archives. PLEASE NOTE: The site may contain material from other sources which may be under copyright. Rights assessment, and full originating source citation, is the responsibility of the user.


Tell Us What You Think About the Maryland State Archives Website!



An Archives of Maryland electronic publication.
For information contact mdlegal@mdarchives.state.md.us.

©Copyright  August 16, 2024
Maryland State Archives