|
1212 LAWS OF MARYLAND [ Ch. 4
Code. This subsection is applicable only
to the Severn River watershed because there
is no similar provision applicable to the
Patuxent River watershed. The only other
changes made are in style.
(B) A STATE, COUNTY, OR MUNICIPAL ROAD,
BUILDING, OR STRUCTURE MAY NOT BE CONSTRUCTED,
RELOCATED, OR ENLARGED WITHIN THE SEVERN RIVER
WATERSHED UNTIL PLANS HAVE BEEN SUBMITTED TO AND
APPROVED BY THE SOIL CONSERVATION DISTRICT.
REVISOR'S NOTE: This subsection presently appears
as Article 66C, section 411AM(b) of the
Code. This subsection only applies to the
Severn River watershed. The only other
changes made are in style.
8-1209. RESTRICTION UPON ISSUANCE OF GRADING AND
BUILDING PERMITS IN SEVERN RIVER WATERSHED.
NOTWITHSTANDING PRESENT PLANNING, ZONING, OP
SUBDIVISION CONTROLS, A PERMIT MAY NOT BE ISSUED FOR
GRADING OR CONSTRUCTING ANY BUILDING, UNLESS THE
GRADING OR CONSTRUCTING IS PURSUANT TO ANY PLAN
APPROVED AS PROVIDED IN §8-1208.
REVISOR'S NOTE: This section presently appears as
Article 66C, section 411AL of the Code. It
is applicable only to the Severn River
watershed since no similar provision
presently appears as to the Patuxent River
watershed. The only other changes made are
in style.
8-1210. PROCEDURE FOR EROSION AND SEDIMENTATION
CONTROL FOR SEVERN RIVER WATERSHED.
WHEN ANY STRIPPING, GRADING, EXCAVATING, OR
FILLING IS DONE, THE SOIL CONSERVATION DISTRICT FIRST
SHALL APPROVE THE PROPOSED EARTH CHANGE BEFORE A
GRADING PERMIT IS ISSUED. STRIPPING, GRADING, AND
CONSTRUCTING SHALL BE DONE IN ACCORDANCE WITH THE
RECOMMENDATIONS OF THE SOIL CONSERVATION DISTRICT TO
CONTROL EROSION AND SILTATION. THE DEPARTMENT SHALL
COOPERATE WITH AND ASSIST THE SOIL CONSERVATION
DISTRICT TO PERFORM ITS RESPONSIBILITIES. THE
APPROPRIATE DEPARTMENT OF ANNE ARUNDEL COUNTY OR THE
CITY OF ANNAPOLIS PROMPTLY SHALL FILE A COPY OF THE
INSPECTION REPORTS WITH THE SOIL CONSERVATION
DISTRICT. ON COMPLETION AND COMPLIANCE WITH EVERY
|