2811
BALTIMORE COUNTY
THIRD PARTIES TO OBTAIN, THE NECESSARY APPROVAL OF
OTHER GOVERNMENTAL AGENCIES. IN SUCH EVENT, THE
COMPANY SHALL REQUEST AND OBTAIN AN EXTENSION OF TIME
TO COMPLY HEREWITH.
(E) THE COUNTY SHALL HAVE THE RIGHT TO INSPECT
ALL CONSTRUCTION OR INSTALLATION WORK, PERFORMED BY
THE COMPANY IN THE STREETS, AND MAKE SUCH INSPECTIONS
AS THE COUNTY DEEMS NECESSARY TO INSURE COMPLIANCE
WITH THE TERMS OF ITS FRANCHISE AND OTHER PERTINENT
PROVISIONS OF LAW.
(F) WITHIN SIXTY DAYS FROM THE DATE OF REQUEST BY
THE COUNTY, THE COMPANY SHALL SUPPLY MAPS DELINEATING
THE LOCATION OF ALL OF ITS THEN INSTALLED CABLES.
(G) NO POLES, UNDERGROUND CONDUITS, OR OTHER WIRE
HOLDING STRUCTURES SHALL BE ERECTED BY THE COMPANY
WITHOUT THE PRIOR APPROVAL OF THE COUNTY, OR ITS DULY
AUTHORIZED PERSONNEL OR ABUTTING PROPERTY OWNERS WHERE
THE COUNTY DOES NOT OWN THE AREA IN WHICH SUCH ARE TO
BE ERECTED. TO THE EXTENT POSSIBLE, THE COMPANY SHALL
NEGOTIATE AGREEMENTS, WITH THE APPROPRIATE PARTIES, TO
PERMIT IT TO UTILIZE THE EXISTING POLES AND
UNDERGROUND CONDUITS THROUGHOUT THE COUNTY. IF THE
COUNTY, AT A FUTURE DATE, REQUIRES ALL UTILITIES TO BE
PLACED UNDERGROUND, IN ALL OR A PORTION OF THE COUNTY,
THE COMPANY SHALL CONFORM TO SUCH REQUIREMENT AT ITS
OWN EXPENSE. ANY POLES, UNDERGROUND CONDUITS, OR
OTHER FIXTURES, THAT THE COMPANY IS AUTHORIZED BY THE
COUNTY TO INSTALL, MUST BE PLACED IN A MANNER TO
PROVIDE MINIMUM INTERFERENCE WITH THE USUAL TRAVEL ON
THE PUBLIC STREETS AND ANY EXISTING UTILITY SERVICES.
(H) THE COMPANY SHALL, ON THE REQUEST OF ANY
PERSON HOLDING AN APPROPRIATE BUILDING PERMIT,
TEMPORARILY RAISE OR LOWER ITS WIRES TO PERMIT SUCH
AUTHORIZED CONSTRUCTION. THE EXPENSE OF SUCH
TEMPORARY REMOVAL OR RAISING OR LOWERING OF CABLES
SHALL BE BORNE BY THE PERSON REQUESTING SAME, AND THE
COMPANY SHALL HAVE THE AUTHORITY TO REQUIRE SUCH
PAYMENT IN ADVANCE. THE COMPANY SHALL BE GIVEN NOT
LESS THAN SEVENTY-TWO (72) HOURS ADVANCE NOTICE TO
ARRANGE FOR SUCH TEMPORARY CABLE CHANGES.
(I) IN THE EVENT THAT THE RELOCATION,
CONSTRUCTION, RECONSTRUCTION, MAINTENANCE, REPAIR, BY
THE COUNTY, OR PUBLIC UTILITY, OF ITS SEWERS, WATER
MAINS, STORM DRAINS, OR OTHER PUBLIC FACILITIES,
REQUIRES THE COMPANY TO BEHOVE, LOWER OR RAISE ITS
|
 |